Monday, July 27, 2009

Updates from Ronnie

It's time for your weekly update from Ronnie.

Here's what he told us they're working on right now and in the near future:
  • Beginning demolition on the staircase (inside)
  • Continuing footing excavation
  • Installing storm piping and manholes (you can see some of these in the photos below)
  • Continuing to excavate and haul off excess dirt
  • Disconnecting some electrical systems inside to prepare for demolition
They've also closed the road up to the security entrance of the museum entirely. Later this week, they hope to start putting down the gravel and asphalt base for the building area, depending on the weather (i.e., if it doesn't rain too much), and next week or the week after they'll start structural steel.

Monday, July 20, 2009

Updates from Ronnie

We just received another weekly report from Holder Construction Company, and we want to keep you up to date!



Friday, July 17, 2009

Updates from Ronnie

Today the hard hat area prohibited us from talking to Ronnie, but we have a photo update. For now click on the images to expand the Holder Construction Company Photo Report and view the Flickr album. We'll have a written update soon!


Wednesday, July 08, 2009

Updates from Ronnie



As we promised, here is your weekly update from Ronnie. Yesterday he informed us of four major points.

First, the earth they scooped out last week is now leveled off into terraces, which will form the terraced sculpture garden. We took a picture from the inside of the museum looking out onto the terraces, but the not-so-photogenic, monochromatic earth doesn’t quite do the terraces justice.

Second, they’re about to start breaking up some of the asphalt in the current staff parking lot just above the terraces.

Third, they’ve put the bulldozers to work and have excavated eight massive boulders from the area where they’re setting the forms for concrete, which brings us to the fourth major point.

The wooden forms are set in place and they will begin pouring the concrete next week – you know what that means – establishing the base and most important part of the new expansion (besides the art inside of course).

Next week we’ll have update number three, and soon we’ll include aerial photos of the museum thanks to Holder Construction!

Tuesday, June 30, 2009

Updates from Ronnie



We’re thrilled to start sharing with you “Updates from Ronnie” (Ronnie Green, Superintendent, Holder Construction). We are documenting GMOA’s expansion, and while it’s still early in the process, big changes are rapidly happening.

On our Flickr account you will find the collection "GMOA Expansion" with week-by-week folders for you to follow at your own leisure.

Yesterday, Ronnie briefly informed us about the progress of these first three weeks. If you look closely at Week 3’s pictures, you can see the stakes extending out from the building. These stakes outline where the new expansion, which will hold our permanent collection, will stand. You’ll be able to walk up the existing indoor stairs that will lead you into the beautiful, new expansion or the existing galleries, which will continue to show temporary exhibitions. Underneath the extension will be parking for docents and volunteers, as well as handicapped parking.

In Week 3’s pictures the bulldozer is scooping out what will be the sculpture garden. This area will serve as a serene spot to view sculpture from GMOA’s permanent collection, relax, eat lunch or just enjoy the museum’s presence.

Although we can dream of relaxing in our sculpture garden, for now it’s only bulldozers and hard hats – check back next week for more updates from Ronnie!