Current week - Activities/Issues:
New Gallery / Connector
· Installing 1st Floor Brick
· Continue working on connector roof
· Reworking and insulating existing roof
· Hanging Drywall both 1st and 2nd floor
· Mud and Tape Finish Drywall
· Framing hard ceiling 2nd floor gallery
· MEP trim out hard ceiling
· Installing exterior stairs
Existing Building Renovations
· Continue MEP overhead rough-in
· Continue framing of walls
· Hanging, mudding and finishing drywall
· Rework existing roof
· Demo exterior walls
Storage Bar
· Completed the exterior concrete wall waterproofing / vapor barrier.
· Framing exterior walls and sheathing
· Spray fire proofing
· Exterior brick started
Next week - Activities/Issues:
New Gallery / Connector
· Continue drywall on 2nd Floor
· Continue installing brick 1st Floor
· Curtain wall framing
· Mud, tape and finish drywall
· Framing hard ceilings
· Digging footings and pouring in courtyard
· Continue exterior limestone work
· Continue Standing walls & pouring site walls
· Backfilling site walls
· Pour connector elevated slab
· Start installing connector stairs
· Paint structural steel connector
· Start connector roof
Existing Building Renovations
· Continue hanging drywall
· Mud and tape finishing structure
Storage Bar
· Continue cmu walls on exterior foundation
· Loading new roof with materials and begin moving existing roof on the Art Building.
· Start new roof on storage bar
· Start fireproofing storage bar
· Start bricking storage bar
Interior gallery
No comments:
Post a Comment